At dusk, an electrician in a green polo stands on the path below a brick single-storey extension, looking up at the PIR floodlight he has just fitted under the eaves, lit and shining down the brick, his stepladder folded against the wall

Testing-first electricians in Darlington

Switched on. Signed off.

Earliest survey slot Tue 17, 10.30am Example

A scorched fuse box, a dead socket or a report due? We test before we quote, then change boards, rewire and certify across Darlington.

  • Price agreed in writing
  • Every circuit tested and certified
  • Building control notified for you
  • Employed electricians only
  • Consumer unit changes
  • EICRs and landlord reports
  • Full and part rewires
  • Fault finding
  • EV chargers
  • Smoke and heat alarms
  • Outdoor sockets and lighting

(As we found it)

Behind the cupboard door

Most calls start with a worry like one of these. On the test, the smell, the dead socket and the old cable each turn out to be a fault with a code, often on one old board; the deadline and the last firm’s phone quote are why people ring.

A 1970s rewirable fuse board on a wooden backboard under the stairs, one carrier scorched, beside the old electricity meter, still in service Example photo
  1. 1 · C2 The smell Cooker fuse carrier, scorched

    “One of the fuses has gone brown, and there’s a warm smell when the oven’s been on.”

  2. 2 · C2 The dead socket Upstairs sockets: the ring is broken

    “The back bedroom socket works one day and not the next, and nobody can say why.”

  3. 3 · FI The extras Old cable into the wall, route unknown

    “The last firm priced it over the phone, then found extras once the floorboards were up.”

  4. Unsatisfactory The deadline The report’s verdict

    “The letting agent needs a satisfactory report by the end of the month.”

(Two days later)

Signed off, every code cleared

The same cupboard under the same stairs in a Cockerton terrace. The condition report reached the owner within 24 hours of the test; after the work, a new report went with it, every code cleared.

A 1970s rewirable fuse board on a wooden backboard under the stairs, one carrier scorched, beside the old electricity meter, still in service As found The same spot under the stairs with a white metal RCBO consumer unit, its solid door open, beside the electricity meter Finished
Example photos Cockerton, October 2026: a 10-way metal RCBO board in place of the fuse box, the kitchen ring rewired, the gas and water bonded. Two days on site, nine circuits certified.

Example job

Test
Condition report Unsatisfactory: three C2 codes and one FI
Quote
One written price for the board and the remedial work
Work
Two days on site
Certificate
Electrical installation certificate, building control notified
Example report

Condition report

NE-3147 · Victorian terrace, Cockerton

A brown 1970s rewirable fuse board on a wooden backboard, its middle fuse carrier browned and scorched
Ob-02 Cooker fuse
The bare copper gas pipe leaving the meter under the stairs, with no earth bonding clamp on it
Ob-05 Gas meter
A white double socket above the skirting in a back bedroom, a plug-in socket tester in its left outlet with its three lights lit
Ob-09 Back bedroom
  • C2 cleared

    Scorching at the cooker fuse carrier in a 1970s rewirable boardBoard changed for a metal RCBO board with surge protection

  • C2 cleared

    Upstairs ring broken at a bedroom socket, running as two radialsBreak found at the socket, remade and tested end to end

  • C2 cleared

    No main protective bonding to the gas pipe at the meterMain bonding added to the gas and the water

  • FI cleared

    Old cable into the wall, route not tracedTraced at the survey, so the written price covered it

At the test: Unsatisfactory

After the work, a new report: Satisfactory

9 circuits certified · Signed: A. Shah

(Services)

One electrician from first test to final certificate

No hand-offs between a salesman, a fitter and a tester. Open a service for what it includes and what it costs.

A white metal consumer unit with its solid door open: a red main switch, a surge protector with a green light and a row of RCBOs, each with a toggle and a test button under a blank label strip, on a plain painted wall A white metal consumer unit in a hallway beside the stairs, its cover on and its door open, every RCBO on, and a clipboard with a completed report and a pen resting on a stair below it A new white double socket on fresh plaster in a terrace front room, a plug-in socket tester in it with its three lights lit, a dust sheet, tool bag, torch and screwdrivers on the floor A white metal consumer unit under the stairs after a fault was put right, its cover on and its door open, every RCBO back on, a small torch on a storage box below it A white EV wall charger with its cable coiled on the holster, on the red-brick side wall of a 1930s semi beside the side door A weatherproof outdoor double socket and a lit up-and-down wall light on the brick beside a back door at dusk

Consumer unit changes

01Consumer unit changesFrom £695
A white metal consumer unit with its solid door open: a red main switch, a surge protector with a green light and a row of RCBOs, each with a toggle and a test button under a blank label strip, on a plain painted wall

Ends “One of the fuses has gone brown, and there’s a warm smell.”

From £695 for a 3-bed semi (typically £695 to £895): a metal RCBO board with surge protection, testing, the certificate and building control notification.

Your old fuse box or plastic board swapped for a metal consumer unit with RCBOs and surge protection. Every circuit is tested before we quote and labelled after, and the change is notified to building control, as Part P requires.

  • Circuits tested before we price the job
  • Power off for about a working day, in stages
  • Installation certificate and building control sign-off
See a board we changed
02EICRs and landlord reportsFrom £160
A white metal consumer unit in a hallway beside the stairs, its cover on and its door open, every RCBO on, and a clipboard with a completed report and a pen resting on a stair below it

Ends “The letting agent needs a satisfactory report by the end of the month.”

From £160 for a flat up to 2 bedrooms; £195 for a 3-bed house.

A full inspection and test of the installation to BS 7671, with every observation coded C1, C2, C3 or FI and photographed. Landlords in England need one at least every five years under the 2020 Regulations.

  • Your report the day after the test
  • Remedial work itemised, nothing added to pad it
  • A copy ready for your tenants and the council
See a report, cleared
03Full and part rewiresFrom £5,200
A new white double socket on fresh plaster in a terrace front room, a plug-in socket tester in it with its three lights lit, a dust sheet, tool bag, torch and screwdrivers on the floor

Ends “They found extras once the floorboards were up.”

From £5,200 for an occupied 3-bed semi, board included, plastering not included.

Planned room by room so you can stay in. Floorboards lifted and relaid the same day, a working light and fridge every night, and a new board with every circuit certified at the end.

  • Most three-bed semis done in five to seven days
  • Dust sheets down and the house swept every evening
  • Plastering quoted separately, never hidden
Get a rough rewire price
04Fault finding and repairsFrom £85
A white metal consumer unit under the stairs after a fault was put right, its cover on and its door open, every RCBO back on, a small torch on a storage box below it

Ends “The back bedroom socket works one day and not the next.”

From £85 for the first hour, then £45 per half hour.

Tripping switches, dead sockets, flickering lights and burning smells, traced with a tester rather than guesswork, and we tell you before the clock runs past the first hour.

  • Emergency line 7am to 10pm, every day
  • Most faults found and fixed on the first visit
  • A minor works certificate when a repair alters a circuit
What to try first
05EV charger installsFrom £995
A white EV wall charger with its cable coiled on the holster, on the red-brick side wall of a 1930s semi beside the side door

Ends “An extension lead out of the front window every night.”

From £995 for a 7 kW charger on a standard driveway (typically £995 to £1,250).

A 7 kW charger on its own circuit, after a check of your main fuse and earthing so the rest of the house keeps working while the car charges.

  • Supply and earthing checked on the survey
  • Supply run through the wall, not along it
  • Notified to building control as a new circuit
Book a supply check
06Sockets, lighting and outdoor powerFrom £140
A weatherproof outdoor double socket and a lit up-and-down wall light on the brick beside a back door at dusk

Ends “A four-way adaptor behind the telly, and another behind that.”

From £140 for an extra double socket on an existing circuit; an outdoor socket from £165.

Extra sockets where you actually need them, new lights, and weatherproof power for the garden, all RCD protected and tested before we leave.

  • Extra double socket from £140, outdoor socket from £165
  • Cables chased in or neatly clipped, your choice
  • Certificate for every addition
Ask about a small job

(Rewire costs)

What would a rewire cost you?

Answer five questions for a guide price. Old cable hides surprises, so the figure we commit to follows a test.

Includes VAT · an occupied 3-bed semi is typically £5,200 to £7,400 · a guide until we have tested

3 bedrooms
Storeys
House
During the work

Likely cost Example

£5,600to£7,300

Circuits
11
Cable, boxes and board
£1,850
Labour and testing
£3,750
Days in your house
5 to 7 days
Book the survey

(Where we work)

Switched on, one street at a time

The terraces and semis of Darlington and the villages around it, from North Road to Heighington.

At dusk, a row of red-brick Victorian terraced houses with bay windows and sash windows seen from across the street, every window lit warm from inside, a lit street lamp and a large tree on the left Example photo

(How it works)

From your call to the certificate

A single socket and a whole-house rewire go through the same five steps, and each one leaves you something in writing.

  1. 01 Call

    Today

    Tell us what is happening

    Ring, email or use the form. Every request is rung back within two working hours, Monday to Saturday.

    You: describe the problem

  2. 02 Test

    At the survey

    We test what you have

    At the board and round the house, with a photo of anything we find, so the written price covers what is really there.

    You: let us in

  3. 03 Price

    48 hours

    A price you can hold us to

    Each item costed in writing, extras flagged as extras. Nothing starts until you say so.

    You: say yes or no

  4. 04 Work

    A day to a week

    The work

    Two days for the Cockerton board, five to seven for a three-bed rewire. The same electrician each day, a working light and fridge every night.

    You: leave a key if you like

  5. 05 Certify

    When we finish

    Certified and notified

    The certificate by email, and building control told on your behalf wherever Part P needs it.

    You: file it

(Who we are)

Eight employed electricians A row of RCBOs in a metal consumer unit and two apprentices, 6,200 certificates written for Darlington homes A row of Victorian terraces off North Road since 2011, and not one job passed to a subcontractor or priced before it was tested.

Two Northgate electricians in green polos standing side by side on the bare boards of a terrace landing after the job, every floorboard back down, a closed tool bag by the wall, daylight from a sash window Example photo
New cable on a Cockerton landingTwo of the team, the boards back down

One van, one tester and a lock-up off Northgate: that was 2011, and Lee Hardy still does surveys himself. Each house now gets a reference, an electrician you can name and a certificate to file.

Meet us on a survey
6,200
Certificates to dateInstallation and minor works certificates, and condition reports.
48 hours
Test to price on paperMost people have our written figure two days after we test.
15 years
Trading in DarlingtonOne yard, one phone number, and most of the original faces.

(Customers)

Heard after the certificate went out

Example review

“One fuse had gone brown and the cupboard smelt warm. They tested first, priced it in writing, changed the board in a day, and the certificate was in my inbox that night.”

Came in with
A scorched fuse and a warm smell
Went home with
A metal RCBO board, certified
JoanneCockerton · Consumer unit change

Example review

“I let four flats in town and the agent wanted reports by the end of the month. Clear codes, a photo of each observation, and nothing padded with work that was not needed.”

Came in with
Four reports due in a month, and a tenant’s dead bedroom socket
Went home with
Four reports in time, the broken ring found, a copy for each tenant
GrahamNorth Road · Landlord reports

Example review

“Another firm’s phone quote kept growing. Northgate tested first, gave us a price in writing, and rewired the house with two children and a dog in it. Lights and the fridge every night.”

Came in with
A quote that kept growing
Went home with
A written price, and the floorboards back each evening
PriyaHarrowgate Hill · Full rewire

(Questions)

Asked on almost every survey

Fix the fault or change the board? We test, then tell you.

Book a quote visit

The codes on a condition report

C1
Danger present
C2
Potentially dangerous
C3
Improvement recommended
FI
Further investigation
The power is off or something smells hot. What do I do first?

If one switch has dropped, unplug everything on that circuit and push it back up once; if it trips again, leave it off and ring us. If something smells of burning, turn off the main switch if it is safe to reach and touch nothing scorched; if you see smoke or flames, get out and dial 999. If the whole street is dark, it is a power cut: ring 105, the free number for your network operator. Our emergency line is open 7am to 10pm every day.

Is my old fuse box dangerous?

Not by age alone. Rewirable fuses still work, but they give no RCD protection against electric shock. We test before we advise, and if your board is sound we say so.

Does a consumer unit change need building control?

Yes. In England, replacing a consumer unit is notifiable work under Part P of the Building Regulations, as is a new circuit or work in the zones of a bathroom. We notify building control for you and pass on the sign-off paperwork.

How often does a landlord need an EICR?

At least every five years in England, or sooner if the last report says so. Tenants get a copy within 28 days of the inspection, and any remedial work is due within 28 days unless the report gives a shorter time.

How many days will a rewire take?

A three-bed semi usually takes five to seven working days with you living in, then a plasterer for a few days to make good.

Can we go to work and leave you a key?

Someone needs to let us in and show us the board. After that most people go to work and leave us a key; we text before the power goes off and when it is back.

When do we pay?

Small jobs are paid on completion. For a rewire, the materials are paid when we order them and the balance when the certificate is issued.

A terraced street in Darlington at dusk, windows lit and street lamps on

(Book a survey)

Tell us what is wrong. We will leave it signed off.

Call
01632 960314 Example
Yard
Off Northgate, Darlington

Your details

The job
When suits you Example dates

Expect a call from the office inside two working hours, six days a week. How we use your details: our privacy notice